Skip to content
Request a Quote + Certification

About Us

About Us

How the work is kept running, and what has stayed the same throughout its growth.

Disciplines 3Service areas 6Coverage Kentucky and the Greater Midwest

Background

Louisville CMM Calibration and Repair coordinates performance verification, repair and programming support for coordinate measuring machines used across Kentucky's and southern Indiana's automotive supply base. The work itself is completed by laboratories accredited to ISO/IEC 17025:2017, operating under ISO 10360 and ASME B89.4.1 depending on the machine and the certificate required. This business schedules, scopes and quotes that work against the customer's standard, machine and tolerance.

How the Work Began

The region's inspection departments sit downstream of stamping, forging and driveline suppliers running IATF 16949 quality systems, where a defective calibration can trigger a reverse-traceability review of every part measured since the last passing result. That pressure shapes how work is scoped here: as-found data is recorded before adjustment on every visit, not only when a failure is suspected.

Scheduling is built around the realities of a Tier 1 or Tier 2 plant — a stopped CMM is a stopped inspection line, and shutdown windows, PPAP deadlines and audit dates drive the calendar more than a fixed annual date does. On-site visits are grouped by corridor across Kentucky, southern Indiana and the Greater Midwest; machines outside a practical travel radius are handled as ship-in work under the same certificate format.

What the Process Is Built On

These are the operating commitments the work is measured against.

  • 01

    As-found first

    Deviation data is recorded before any adjustment, on every visit.

  • 02

    Scope before quote

    The performing laboratory's accredited scope is checked against the tolerance before work is booked.

  • 03

    Standard matched to frame

    ISO 10360-2, -5, -10 or -12 is applied according to the machine, not a default certificate.

  • 04

    Documented, not verbal

    Out-of-tolerance findings are notified in writing with enough detail to run an impact assessment.

Other Pages to Check

The standards, traceability arrangements and management system behind the work are set out on the quality system page. The competence criteria for the people doing the work are outlined on the our team page.

Reviewing a new supplier?

Each quotation specifies the scope, turnaround and documentation involved.

Request a Quote + CertificationEmail us